2022 Apr - 2024 Mar
All swameg
Assisted in the design and execution of a residential building project, achieving a 20% reduction in construction time and a 15% decrease in material costs through effective planning and resource allocation. Collaborated with a team of engineers to perform a comprehensive site investigation, contri
Login to see all CVs available on OpenSooq